For this article we will focus on the demand for plaster to create a well-prepared wall closed. There is a constant that follows the application of plaster on the wall, follow it and find your program of plaster works very smoothly.

1: First, decide which part you want to keep plastering trowel kg

2: For example, if you are right handed, stands directly on the plastered wall, look at the far left corner near the ceiling, and this is the place where you start to apply the first coat of plaster.

Basically, as you might think that the whole wall area was divided into four equal parts, which we call A, B, C and D.

A top to bottom left corner of the wall.

B is higher than the lower-right corner of the wall.

C is the bottom left of the wall.

D is the bottom right corner of the wall.

3: Apply the plaster to the first section ( "A", the leftmost > The corner closest to the ceiling) when you apply the patch.

4: Hover over and the next section (B, opposite direction of the extreme right of the curve closer to the ceiling) and will be the first two sections are not included.

5: Next, go to the bottom left corner of the wall, C, and apply the plaster, just overlapping the first section, which is already covered.

6: Finally moving on and the last section (D, bottom right> Angle on the wall.)

From now on, your whole wall covered in the first layers of plaster.

To summarize, the plaster on the first part of your wall when it is finished, making the use of plaster of stroke, as you move to the next section of the wall. But do not forget that each layer of plaster applied to overlap slightly the last shot just applied the patch, ie, if part of the patch applied to the wall, notmove right next to the place in another area of the wall to reapply, however, to take each stroke of the right side and slightly overlapping the last cast as one moves along the wall.

Tone Dale Above 2009
Go ahead, create a craze!